Overview picture (10kw wind turbine generator system with 12m hydraulic tower) Tower is a significant part for the wind turbine generator system (WTGS). Curr…
Video Rating: 5 / 5

1 reply
  1. R Le Florent
    R Le Florent says:

    I will make the concrete and after, make assembling the same in my garden
    in Belgium. Normally, works will be finish in march 2.012 Les travaux de
    béton, assemblage et fonctionnement seront terminés pour mars 2.012 à
    Brugelette, en Belgique. Informations: info@aapcarwash.be

    Reply

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply to R Le Florent Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.